Bathroom Renovation Costs UK 2026: A Realistic Guide

2026-07-25

Bathroom renovation costs UK 2026 — a realistic guide

A dated bathroom is the second-fastest way to lose tenants and buyers (after a dated kitchen). It's also one of the most predictable renovation costs — the scope is limited, the trades are well-understood, and the pricing is consistent. Yet investors still get caught out by tiling costs, plumbing complications, and the extras that push a £3,000 budget to £6,000.

This guide gives you the 2026 numbers, split by investor use case.

The Full Cost Breakdown

Bathroom Suite

Item Budget Mid-Range Premium
Bath (standard acrylic) £80-£150 £200-£400 £500-£1,200
Shower (electric over bath) £150-£250
Shower (thermostatic + screen) £300-£600 £600-£1,200
Toilet (close-coupled) £80-£150 £150-£300 £300-£600
Basin (pedestal) £50-£100
Basin (wall-hung/vanity) £150-£400 £400-£800
Taps (pair or mono mixer) £30-£80 £80-£200 £200-£500
Suite total £390-£730 £880-£1,900 £2,000-£4,300

BTL advice: A clean, white, close-coupled toilet, pedestal basin, and acrylic bath with an electric shower is all you need. Tenants want functional and clean, not designer. Budget £400-£700 for the suite.

Flip advice: Wall-hung toilet, vanity basin unit, and a proper thermostatic shower with glass screen. These create the visual impact that buyers notice. Budget £1,000-£2,000 for the suite.

Tiling

Tiling is where bathroom budgets quietly explode. The tiles themselves are cheap — the labour is not.

Scope Tile Cost Labour Total
Splashback only (2-3m²) £40-£100 £150-£250 £190-£350
Bath surround (4-6m²) £80-£200 £250-£400 £330-£600
Half-height all walls (8-10m²) £160-£350 £400-£650 £560-£1,000
Floor to ceiling all walls (15-20m²) £300-£700 £650-£1,200 £950-£1,900
Floor only (3-5m²) £60-£150 £150-£300 £210-£450

BTL: Tile the bath surround and floor. Leave the rest painted. Total: £500-£800.

Flip: Full-height tiling on the wet wall (behind bath/shower), half-height on remaining walls, tiled floor. Total: £800-£1,500.

Plumbing

Work Cost
Like-for-like suite replacement (same positions) £400-£700
Moving waste/supply pipes (new layout) £600-£1,200
Fitting thermostatic shower (new, from scratch) £300-£500
Radiator replacement (towel rail) £150-£300
Full replumb of bathroom £800-£1,500

If you're keeping the same layout (toilet, basin, bath in the same positions), plumbing is straightforward and cheap. Moving anything adds significant cost.

Electrics

Work Cost
Extractor fan (replacement) £80-£150
Extractor fan (new, ducted) £150-£300
Downlights (IP65 rated, 4-6 spots) £200-£400
Heated towel rail (electric, including wiring) £200-£400
Shaver socket £60-£100
Electric shower installation (new circuit) £200-£350

All bathroom electrics must be done by a Part P qualified electrician or signed off by building control.

Other Costs

Item Cost
Strip-out and disposal of old bathroom £200-£400
Plastering (full room after tile removal) £300-£500
Floor levelling (self-levelling compound) £150-£300
Silicone and sealant (proper job) £30-£50
Accessories (toilet roll holder, hooks, mirror) £30-£100
Decoration (ceiling + any untiled walls) £100-£200

Total Costs by Level

Level Suite Tiling Plumbing Electrics Other Total
Budget BTL £500 £600 £500 £200 £400 £2,200-£3,500
Mid-range BTL £800 £900 £700 £350 £500 £3,250-£5,000
Flip standard £1,500 £1,300 £800 £400 £600 £4,600-£7,000

:::stats £2,200-£3,500 | Budget BTL Bathroom £3,250-£5,000 | Mid-Range BTL Bathroom £4,600-£7,000 | Flip Standard Bathroom :::

The Hidden Costs

Rotten floor joists. Old bathrooms with leaking baths or showers often have water damage to the floor joists underneath. You won't know until the old bath is removed. Repair: £300-£800.

Asbestos in old tiles or adhesive. Pre-1990 vinyl floor tiles and some wall tile adhesives contain asbestos. Removal by a licensed contractor: £400-£1,200.

Soil pipe issues. Moving a toilet requires moving the soil pipe. If the bathroom is upstairs and the soil pipe runs internally, this can be complex and expensive: £500-£1,500.

Inadequate ventilation. If there's no extractor fan and no window, you'll need to install ducted ventilation to comply with building regs. If the duct run is long (through an internal room), costs rise: £250-£500.

Tanking. If you're creating a walk-in shower or wet room, the floor and walls need tanking (waterproof membrane). Materials + labour: £300-£600.

[!tip] The BTL bathroom rule For rental properties, spend the minimum that creates a clean, bright, functional bathroom. White suite, neutral tiles, electric shower, good lighting. A tenant paying £800/month doesn't need a rain shower head or a freestanding bath. They need hot water, good pressure, and no mould.

Timeline

Scope Duration
Like-for-like suite swap + freshen up 2-3 days
Full strip + new suite + full tiling 4-6 days
Layout change + full renovation 7-10 days
Structural work (moving walls/soil pipe) 10-14 days

Budget your void period or bridging interest accordingly.

En-Suite Bathrooms (HMO Addition)

Adding en-suites to HMO rooms increases room rent by 15-25%. Typical en-suite addition cost:

Item Cost
Partition wall + door £400-£800
Plumbing (shower, toilet, basin) £1,000-£1,800
Tiling (small room, 6-8m²) £400-£700
Electrics (fan, light) £200-£350
Suite (compact) £400-£700
Total en-suite addition £2,400-£4,350

On a room renting at £500/month, an en-suite might push it to £600/month — an extra £1,200/year. Payback period: 2-3.5 years. After that, it's pure profit. Worth doing on rooms where the layout allows it.

Build Your Bathroom Budget

The Renovation Spec tool lets you spec a bathroom line-by-line with current UK pricing, so you can get accurate quotes and compare like-for-like.

:::tool renovation-spec Spec Your Bathroom Budget :::

For the full room-by-room renovation cost guide, see House Renovation Costs UK 2026.

Summary


Costs in this guide are estimates based on 2026 UK market data. Prices vary by region, specification, and contractor. Always obtain multiple quotes.